New Delhi, 11 March 2026: NTPC REL declares commercial operation of 270 MW solar capacity at Khavda-II Solar PV Project located in Gujarat, taking the installed capacity of NTPC Green to 9562.68 MW and NTPC Group capacity to 88452 MW.
New Delhi, 11 March 2026: NTPC REL declares commercial operation of 270 MW solar capacity at Khavda-II Solar PV Project located in Gujarat, taking the installed capacity of NTPC Green to 9562.68 MW and NTPC Group capacity to 88452 MW.